-
High Efficiency Tunneling: The CREC Cantilever TBM uses advanced tunneling technology and a powerful cutting head, capable of efficiently tunneling through hard rock and complex geological conditions, ensuring project progression.
-
Automated Control: Equipped with a modern automated control system, it supports remote monitoring and operation, reducing manual intervention, and enhancing safety and precision during construction.
-
Modular Design: The equipment features a modular design, making it easy to transport and assemble. It can adapt to different tunnel diameters and lengths, providing high flexibility and adaptability to various construction needs.
-
Stability and Safety: Built-in with multiple safety mechanisms, such as real-time monitoring systems and emergency braking devices, it ensures stable operation and operator safety in various construction environments.
-
Energy Efficiency and Environmental Protection: Utilizing energy-efficient motors and high-efficiency hydraulic systems, it reduces energy consumption and environmental pollution, meeting modern tunnel construction’s green and eco-friendly requirements.
Success Added !